Hong Kong Data Center Maintenance
Essential Hardware Upgrades for HK4
Friday, April 3, 2026 – Scheduled Power Cycling for Performance & Reliability
Maintenance Window: 16:00 to 23:59 (HKT/GMT+8) | 08:00 to 16:00 (UTC)
Why Are We Performing This Maintenance?
In the fast-paced landscape of Hong Kong hosting, staying still means falling behind. The HK4 facility is a strategic hub for UnderHost, providing low-latency connectivity to mainland China, Southeast Asia, and global markets. To maintain our commitment to offshore hosting and high-performance computing, we must periodically upgrade our core infrastructure.
This specific maintenance involves critical network switch firmware updates and power distribution unit (PDU) enhancements. These upgrades are essential to prevent the common issues faced in Hong Kong data centers, such as network bottlenecks and hardware failures that lead to unexpected downtime. By proactively replacing and upgrading these components, we are adhering to the best practices of hardware lifecycle management, ensuring that your VPS and dedicated servers run on the most reliable equipment available [citation:7].
Impacted Services: What You Need to Know
During the maintenance window on Friday, April 3, 2026, from 16:00 to 23:59 Hong Kong time, all physical and virtual services located in our Hong Kong facility will be temporarily powered off. This includes:
- All VPS (Virtual Private Servers) hosted in HK
- All Dedicated Servers housed in HK
This hard shutdown is necessary because the upgrades are at the electrical and physical networking layer. Simply rebooting the virtual layer is insufficient; we need to ensure the power supply stability and core switching fabric are 100% optimized to prevent issues like packet loss or voltage irregularities post-upgrade. Once the maintenance is completed, all systems will be powered back on automatically.
Unsure if your service is in HK? Log into your client area at @CustomerPanel and check your service details, or simply open a support ticket and we’ll confirm it for you instantly.
Our Commitment: Transparency & Proactive Support
We understand that an 8-hour maintenance window raises questions. To be fully transparent, we are following industry-standard protocols seen with global providers who regularly schedule maintenance in their Hong Kong PoPs to ensure stability.
Step 1: Backup
- Run a full backup via your control panel.
- Consider offsite backup solutions.
- Verify backup integrity before the 3rd.
Step 2: Schedule
- Plan your cron jobs around the window.
- Notify your users of potential downtime.
- Update your DNS TTLs if you have a failover.
Step 3: Confirm
- Unsure? @CustomerPanel to verify location.
- Need temp VPS? Request now.
- Bookmark our live status page.
The Long-Term Benefit: Why “Planned” Beats “Unplanned”
In the world of Hong Kong servers, unplanned downtime is the real enemy. Studies show that a significant percentage of Hong Kong VPS failures stem from maintenance neglect rather than hardware age. By scheduling this maintenance, we are addressing the root causes of instability before they affect you.
Post-maintenance, HK will feature enhanced power redundancy and cooling system efficiency, which is vital given Hong Kong’s subtropical climate and the high-density demands of modern servers. This directly translates to a lower probability of thermal throttling or power surges disrupting your business. We are investing in the green and sustainable operation of our data center to ensure it meets the highest international standards for management and maintenance.
Need a Temporary Home for Your Workloads?
We value your business continuity. If an 8-hour window is critical for your operations, we can spin up a temporary VPS for you in another region (like Moldova or the Netherlands) at no additional cost for the rental during the migration period.
Reach out to support at https://underhost.com/contact.php to arrange this.
点击查看中文版本 (Click for Chinese Translation)
▼
香港數據中心維護通知
基本硬件升級 – HK4 機房
尊敬的客戶,
我們特此通知您,香港4(HK4)數據中心將進行一次計劃內的維護。此次維護窗口長達8小時,雖然停機不可避免,但這對於部署下一代基礎設施至關重要,能夠確保您的服務在未來數年內保持競爭力、快速且穩定。
維護時間:
2026年4月3日(星期五)— 16:00 至 23:59(香港時間,GMT+8)
2026年4月3日(星期五)— 08:00 至 16:00(UTC)
受影響服務:
所有位於香港4(HK4)的服務,包括VPS和專用伺服器。在維護窗口期間,您的服務將會暫時關閉。維護完成後,所有服務將會重新啟動。
我們的行動與您的準備:
- 數據備份: 請務必在維護前備份您的數據。您可以使用控制面板進行完整備份,或利用我們的 備份解決方案。
- 業務連續性: 如果您無法承受任何停機時間,請立即聯繫我們。我們可以在其他地點(如荷蘭或北美)為您提供臨時VPS,以幫助您在維護期間轉移關鍵業務。
- 我們的承諾: 此次維護是為了升級網絡交換機固件和配電單元,旨在防止未來出現意外宕機,並提高電源冗餘和冷卻效率。這是我們對提供穩定、高性能香港主機服務的長期承諾的一部分。
對於此次維護可能造成的不便,我們深表歉意。如有任何疑問,歡迎隨時通過 https://underhost.com/contact.php 聯繫我們的支持團隊。
不確定您的服務是否受影響? 請登錄您的客戶區 @CustomerPanel 查看服務詳情,或提交支持工單查詢。